Planning given for Glenveagh National Park bridges refurbishment


Granted proposals aim for safe access near Owencarrow River
The Department of Housing, Local Government and Heritage has successfully obtained planning permission from Donegal County Council for the refurbishment of two bridges and the construction of a new pathway at Glenveagh National Park.
Proposals which were granted were described as “a low-impact, policy-compliant enhancement to the park’s pedestrian infrastructure and supports the long-term management and enjoyment of this nationally significant landscape,” which sits at the heart of the Derryveagh Mountains.
A planning report submitted by Carr Consulting Engineers, as part of the successful application, stated: “The proposed works are to be carried out along the main pedestrian route from the Visitors’ Centre to the Castle and includes the refurbishment of two existing pedestrian bridges and the construction of a new pedestrian path connecting the Bridge Cottage to the main pedestrian route.
“The refurbishment work to the bridges consists of the replacement of the existing structural steel structure supporting a timber deck and parapets.
“The new pedestrian path will be constructed across original ground roughly parallel with the Owencarrow River to provide a safe access for pedestrians to and from the Bridge cottage.
“The new path will follow the existing ground contours, and its finish will match the existing gravel path. Some natural mounding and indigenous landscaping will be provided to the southern side of the path to screen off the administration building and compound.”
Donegal County Council granted planning permission with five conditions, imposed to To ensure the integrity and preservation of designated EU habitats and their qualifying interests, to preserve the amenities of the area, and in the interests of public health.