Planning sought for replacement bridge over Ardara angling river

Current bridge in Clonconwal described as 'completely unfit for purpose' near Ardaraplaceholder image
Current bridge in Clonconwal described as 'completely unfit for purpose' near Ardara

Inland Fisheries Ireland submits application for Clonconwal bridge over River Owenea

Inland Fisheries Ireland has sought planning permission from Donegal County Council for the demolition of a pedestrian bridge over the River Owenea, near Ardara described as “completely unfit for purpose” and the construction of a replacement bridge.

James Doherty, on behalf of Inland Fisheries Ireland, submitted the application, applying for the removal of an existing, structurally unsound pedestrian bridge in Clonconwal, over the river and the construction of the new pedestrian bridge. Clear spanning the river with abutments to both banks to support the bridge structure, and all ancillary site works.

The River Owenea, over which the bridge is planned for, is described by Angling Ireland as “beloved by many fly fishermen, and when in good condition, it is one of the best in the country for ‘free rising’ salmon.”

A structural report written by David Buchanan of W.D. Buchanan Co & Ltd was included in the proposal’s supporting documents. It was said: “This bridge could be better described as a small walkway spanning across a wide section of the Owenea River. The bridge is made up of a 400 mm-wide metal walkway, which is supported on small metal beams which span between the river banks and a central abutment placed in the middle of the river. An aluminium handrail has been placed on either side of the bridge.

“The bridge which has been constructed is completely unfit for purpose, both from a structural and Health & Safety point of view. The metal support to the walkway is completely undersized, and this causes excessive deflection and movement of the walkway when used. The handrail which has been provided is a very simple, single rail spanning several metres between posts, and this gives virtually no protection to pedestrians using the bridge.

“We would recommend that this bridge be completely replaced with a structure more fit for purpose. A new safety rail/balustrade should also be installed. A more thorough inspection of the stone abutments would be required, but they appear to be in relatively good condition and could be used to support the new bridge. In the meantime, we would recommend that access to the bridge be sealed off so it cannot be used by members of the public.

Donegal County Council has set a decision due date for the submitted planning application for November 29.

Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice