Southern Donegal-based group water supply scheme to connect to public water

Townawilly Group Water Scheme near Lough Eske will be connected to public water supply schemeplaceholder image
Townawilly Group Water Scheme near Lough Eske will be connected to public water supply scheme

Existing Townawilly Water Treatment Plant near Lough Eske to be decommissioned in new plans

Donegal County Council has granted planning permission to connect the Townawilly Group Water Scheme to the public water supply scheme.

As part of the development, the current Townawilly Water Treatment Plant will be decommissioned.

Approximately 5.2km of 150mm maximum diameter pipeline will be laid in numerous townlands near Lough Eske, as well as the relaying of roughly 1km of pipeline. 

The site crosses over sections of Lough Eske and Ardnamona Woods, a designated European Natura 2000 site.

Areas affected by the planning decision include Cornaveagh, Goladoo, Corracramph, Garvagh, Tawnaghgorm, Ardatowel, Ardeevin, Ardnableask, Tawnwully Mountains, and Milltown. 

The decision was granted by Donegal County Council along with 13 conditions, including conditions that aimed to prevent flooding, preserve the local amenities, and ensure the integrity and preservation of designated EU habitats.

Aideen Quinn, in the planner’s report, considered the location of the site within a ‘Structurally Weak Rural Area’ and the conditions recorded. She commented: “The proposed development would not injure the amenities of the area, would not be prejudicial to public health, and would not endanger public safety by reason of a traffic hazard.”

Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice